Solutions

From first drawings to first charge.

One partner across the entire project lifecycle — incentive strategy, charging design, installation, and operations — scoped to fit new construction, retrofits, or your own construction team.

Engagement models

Matched to how your project is built.

New construction

We work from your architectural, civil, and electrical plans to design charging in from day one — coordinating rough-in and stub-ups with your GC, supplying equipment, timing filings, and commissioning 1–3 months before CO.

Retrofit & expansion

Live properties that never had charging, EV-ready shells, or a swap-and-expand from another vendor. We design around existing panels and parking, and load management often avoids a service upgrade entirely.

Supply only

Prefer your own electrical contractors? We supply standardized, submittal-ready hardware and the network behind it — with layout guidance and engineering support so your crews install once, correctly.

The customer journey

Earlier is better. Late isn't a problem.

We can join at any stage — and we've saved more than one CO date. The earlier we're in, the more incentives and construction savings we can capture.

Pre-development

Flag infrastructure & zoning with the architect and MEP.

Recommended

~50% design

Lock the incentive plan & construction timing with the GC.

Permitting

Finalize the submittal package and pursue eligible soft costs.

Construction

Coordinate rough-in & stub-ups, supply equipment, time filings.

Pre-occupancy

Bolt in & commission 1–3 months before CO.

Already built? Three of four paths stay fully incentive-eligible.

EV-ready with nothing purchased — full scope. Live with no charging — retrofit. Another vendor on site — swap & expand. Equipment already purchased — we can re-engage for swaps. In every eligible path, incentives simply require Buzze as the equipment and network provider.

Real Buzze charging site plan — 125 Level 2 chargers at Juniper Residences, Denver
Design & standardization

Designed around your site.

We turn your plans into a code-compliant charging layout — then install it your way.

  • We review your plans

    Architectural, civil & electrical plans and panel schedules — nothing guessed, everything verified.

  • We design your layout

    Charger placement, mounting, and EV-ready infrastructure — code-compliant and built to expand.

  • We install it your way

    Full turnkey with our crews, or alongside your own electrical contractors.

  • One standard across your portfolio

    The same submittal-ready spec, hardware kit, and commissioning process on every property — so the tenth project runs like the first.

Engineering plansPermittingStripingCommissioning

Pictured: real site plan — 125 Level 2 chargers, Juniper Residences, Denver.

Optimized for incentives

We find all available funding.

A full-time incentives specialist runs every project: programs found, applications prepared, approvals coordinated, and reimbursements filed — start to finish, at no additional cost. We never inflate pricing to secure your funding.

  • Never invoiced before your award letter

    You never sign on a hope — funding is confirmed before you spend.

  • You own the hardware and equipment

    Assets on your balance sheet, not ours.

  • We handle any required reporting

    Program compliance stays off your team's plate.

  • Submit multiple projects at once

    Portfolio owners can batch applications across properties.

Ribbon cutting at Sienna at Sloan's Lake with Koelbel and Xcel Energy

Ribbon cutting at Sienna at Sloan's Lake — a Buzze × Koelbel project with Xcel Energy and the Mayor of Denver.

%